Assessment Test-24 PAKISTAN STUDIES (MCQs)

The height of Tarbela Dam is:

  • (A) 133.75 m
  • (B) 143.20 m
  • (C) 141.53 m
  • (D) 165.14 m
Check Answer
  • (B) 143.20 m

The Marala Headwork’s is located on:

  • (A) Ravi River
  • (B) Indus River
  • (C) Jhelum River
  • (D) Chenab River
Check Answer
  • (D) Chenab River

Prime Minister Nawaz Sharif and former President Asif Ali Zardari jointly performed the ground breaking of a coal project in:

  • (A) Islamkot
  • (B) Rahim Yar Khan
  • (C) Hyderabad
  • (D) Kanpur
Check Answer
  • (A) Islamkot

Which one of these is a River of Sindh Province?

  • (A) Indus
  • (B) Nari
  • (C) Hub
  • (D) Mula
Check Answer
  • (A) Indus

In which year Sir Syed Ahmed Khan wrote his famous book “The Indian Mussalmans”?

  • (A) 1871
  • (B) 1873
  • (C) 1875
  • (D) 1877
Check Answer
  • (A) 1871

Total outlay of Federal Budget 2016-17 is:

  • (A) 4395 billion
  • (B) 4118 billion
  • (C) 4106 billion
  • (D) 4210 billion
Check Answer
  • (A) 4395 billion

Works on _________ in fiscal year 2015-16. MW new power projects under way

  • (A) 7000
  • (B) 6000
  • (C) 5500
  • (D) 6500
Check Answer
Add

Karachi Nuclear Plant was built with the help of:

  • (A) Germany
  • (B) France
  • (C) China
  • (D) Canada
Check Answer
Add

The Indus Water Treaty was signed on:

  • (A) 19th September 1962
  • (B) 19th September 1963
  • (C) 19th September 1960
  • (D) 19th September 1965
Check Answer
Add

The installed capacity of Chashma Nuclear Plant is:

  • (A) 320 MW
  • (B) 328 MW
  • (C) 325 MW
  • (D) 310 MW
Check Answer
Add